EducationPolicy

Primary Sources The documents themselves, cited. Published Wednesdays.

One lease, one subsurface sale, ten years

Over the ten years to 2026 a Vancouver school district completed one long-term lease and one subsurface sale, and sold no whole school site. Two sites left the enrolling inventory, both by closure, and neither has been disposed of.

A count like this should take an afternoon with a register. There is no register, so it took six files, three bodies and a court judgment.

The count.

FigureWhat it is
1completed long-term lease
0outright sales of a whole school site
2sites out of enrolling use, neither disposed of
1surplus consultation opened, then suspended

Those four figures are the whole finding, and everything below shows where each one comes from and what had to be read to produce it1.

The ledger, six rows.

SiteActionBoard decision datesInstrument
Sir Sandford Fleming, south portion, 1401 to 1455 E 49th AveLong-term lease completedSurplus 25 May 2021; offer accepted 27 November 2023; by-law two readings 23 September 2024; third reading 25 September 202499-year pre-paid ground lease, about $8.5 million, to Vittori Developments Ltd. and Vittori Lanark Holdings Ltd.
Queen Elizabeth AnnexClosed, declared surplus, not disposed ofClosure approved 6 June 2022, effective 30 June 2023; surplus declared 11 April 2023None executed. Transfer to the francophone authority recommended by sale or long-term lease
Sir Guy CarletonFormal closure, not disposed ofThird reading 18 December 2025None. The francophone authority requested acquisition in January 2024
Graham Bruce, eastern portion, 0.39 ha of 1.98 haSurplus consultation opened, then suspendedConsultation authorised 29 May 2023 in closed session; heard at Facilities Planning 7 June 2023; subdivision suspended 25 September 2023None. Site intact
Lord Roberts AnnexSubsurface sale only. Surface retained, school rebuilt on the same siteBoard approved 25 June 2018; agreements concluded by September 2018Subsurface parcel $48.3m, rights-of-way and covenants $16.7m, five-year construction lease $8.0m, playfield up to $2.0m. Total $73m to $75m
Kingsgate MallPre-existing ground lease, not an action inside the ten yearsSupreme Court of British Columbia ruled 20 December 2024, published 10 January 2025Lessee Kingsgate Property Ltd. Court set land value at $20 million at 1.0 FSR and rent at $1.65 million a year

Six rows, and only one of them is a completed long-term lease of school land inside the period. One more is a completed sale of an interest in land, at the Lord Roberts Annex, where only the subsurface parcel moved. No row is an outright sale of a whole site1.

Two rows that are commonly read the wrong way.

The Lord Roberts Annex did not leave the enrolling inventory. The surface was retained and a replacement school stands on the site, so a count that records it as a site disposal removes a working school from the tally1.

Kingsgate Mall falls outside the period as an action. The lease predates the ten years counted here, and what falls inside the window is a court ruling rather than a board decision2.

Removing those two misreadings is what takes the count of whole-site sales to zero.

The closure round that produced nothing.

On 3 October 2016 the Board suspended a closure process covering eleven schools, and none of the eleven were closed by 30 June 20173.

A round that ends this way produces no bylaw and no instrument, so it registers in no count of closures and no count of disposals. It appears in a news release. The ten-year record therefore opens with a process that consumed a year of public attention and left no entry in any ledger of outcomes.

Ten years of the estate, six dated records
Each marker is a dated decision in the board record. The bar beneath is the ten-year period across which the count was taken. One completed long-term lease sits inside it, along with one completed sale of a subsurface interest, and no sale of a whole site.

How long each step took.

Two of the intervals in the ledger can be measured directly.

IntervalFromToMonths
Fleming, surplus declaration to third reading25 May 202125 September 202440 4
Queen Elizabeth Annex, surplus declaration to today11 April 202330 September 202641 5
Carleton, end of enrolment to closure vote201618 December 2025about 111 6

The one completed lease took 40 months from surplus declaration to third reading of the by-law4. The one other site that reached a surplus declaration has now been in that state for 41 months with no instrument executed5. Those two figures are close, and the record read carries no target, standard or expected duration against which either could be assessed.

Why the count had to be assembled.

No consolidated register of school land transactions was located for this district. The count above was built by reading board and committee records site by site, and the district’s school-closures page still serves content from 20101.

The district’s Long Term Planning page describes the instrument that would carry this information in the future tense. When the results of Land Asset Management Studies identify opportunities to generate new revenues through the lease or disposition of surplus land holdings, the District “will develop” a Land Asset Strategy. No such document is linked, named, versioned or dated, and two indexed addresses for it return a 4047.

That is the practical consequence of a missing register. Six rows took a records search, and a reader wanting to check them has to repeat it.

What each row had to satisfy.

Three instruments govern the rows above.

  • Policy 14, School Closure, adopted 24 September 2018 and revised 27 May 2026. Closure means a cessation of more than twelve months. Engagement runs at least 60 days, at least one public meeting is announced at least 14 days ahead, submissions are before the Board no later than 14 days before the decision, and the decision is made by School Closure Bylaw8.
  • Policy 20, Disposal of Land or Improvements, adopted 24 September 2018 and amended 27 September 2021. Six steps, beginning with a title search and consultation and turning on a Board resolution declaring the property surplus, then a public request for proposals or tender, Minister approval with appraisals, and a Real Property Disposal By-law9.
  • Ministerial Order M193/08, effective 3 September 2008. A board must not dispose of land by sale and transfer in fee simple, or by lease of ten years or more, unless the disposal is to another board or an independent school for educational purposes or is approved by the Minister10.

The Ministry’s policy page states that only in exceptional circumstances should a board consider permanently disposing of school property, and that property sold for non-educational and non-community use must go to public tender or another competitive bidding process11. Read against the ledger, the ten-year record is consistent with that statement: one long-term lease, one sale of a subsurface interest, and no permanent disposal of a whole site.

What the count establishes, and what it does not.

It establishes what the records read contain: one completed long-term lease, one completed subsurface sale, two sites out of enrolling use with no instrument on either, one suspended consultation, and one pre-existing lease that produced a court ruling inside the window.

It does not establish that nothing else occurred, because with no register there is nothing to check a records search against. And it covers one district over one ten-year window, so it supports no statement about any other district or any longer period.

One register, one row per transaction, six fields.

One register, one row per transaction, six fields: the site, the instrument, the board decision dates, the consideration, the statutory route taken, and whether the site remained in enrolling use the day after closing. Published, dated, and amended when a by-law passes.

Everything in the table above already exists in a public document. What took a records search was finding the documents, not reading them. A register would move that work from every reader to the body that already holds the paper.

A register of that kind settles nothing that is properly a decision. Those remain the Board’s decisions and the Minister’s approvals, made by the people accountable for them, from a page anyone can check.

Further records read for this piece, and the arithmetic behind its figures, are set out in Sources.121314156

Sources

  1. Vancouver School Board, board and committee records for Sir Sandford Fleming, Queen Elizabeth Annex, Sir Guy Carleton, Graham Bruce and the Lord Roberts Annex, 2018 to 2026, and the district school-closures page, assembled from the published agendas and minutes and retrievable through the district’s agendas and minutes search. Every date, instrument and consideration in the ledger table, the retention of the surface and the replacement school at the Lord Roberts Annex, the absence of any consolidated disposal register, and the school-closures page still serving 2010 content. ↩ ↩2 ↩3 ↩4

  2. Supreme Court of British Columbia, Kingsgate Property Ltd. v Vancouver School District No. 39, 2024 BCSC 2325, 20 December 2024. The lessee named as Kingsgate Property Ltd., the land value set at $20 million at 1.0 floor space ratio, and the rent set at $1.65 million a year. ↩

  3. Vancouver School Board, Vancouver Board of Education suspends school closure process, 3 October 2016. The suspension of the closure process on 3 October 2016 and the fact that none of the eleven schools identified were closed by 30 June 2017. ↩

  4. Fleming, surplus declaration to third reading: forty months. 25 May 2021 to 25 September 2024 = 40 months Counted from the surplus declaration to the third reading of the by-law. It measures elapsed time on the one completed lease in the record and sets no standard, because the records read carry no target duration. ↩ ↩2

  5. Queen Elizabeth Annex, surplus declaration to the date of this piece: forty-one months. 11 April 2023 to 30 September 2026 = 41 months Counted to publication. The interval is still running, so the figure rises with time and is not comparable to a completed interval without saying so. ↩ ↩2

  6. Carleton, end of enrolment to the closure vote: about 111 months. August 2016 to 18 December 2025 = 112 months, or nine years and four months Enrolment ceased in 2016, in the year of the fire, and the records read give the year rather than a month, so the month count is approximate and the year count of nine is the firmer figure. ↩ ↩2

  7. Vancouver School Board, Long Term Planning page. The conditional future tense describing a Land Asset Strategy the District will develop, the absence of any linked, named, versioned or dated document, and the two indexed addresses that return a 404. ↩

  8. Vancouver School Board, Policy 14, School Closure, adopted 24 September 2018, revised 27 May 2026. The twelve-month definition of closure, the 60-day minimum engagement period, the 14-day notice and submission requirements, and the School Closure Bylaw as the decision instrument. ↩

  9. Vancouver School Board, Policy 20, Disposal of Land or Improvements, adopted 24 September 2018, amended 27 September 2021. The six disposal steps, the Board resolution declaring a property surplus, the public request for proposals or tender with its exceptions, the application for Minister approval with appraisals, and the Real Property Disposal By-law. ↩

  10. Ministerial Order M193/08, Disposal of Land or Improvements Order, effective 3 September 2008. The prohibition on disposal by sale and transfer in fee simple, or by lease of ten years or more, without an educational transfer or Minister approval. ↩

  11. Ministry of Education and Child Care, school building closure and disposal policy page. The statement that only in exceptional circumstances should a board consider permanently disposing of school property, and the requirement of public tender or another competitive bidding process. ↩

  12. Court of Appeal for British Columbia, Vancouver School District No. 39 v. Kingsgate Property Ltd., 2026 BCCA 98, 10 March 2026, both appeals dismissed. That the rent set at trial stands. The Court of Appeal upheld the chambers judge on the 1.0 FSR valuation of $20,000,000 and the resulting annual rent of $1,650,000, and dismissed both appeals. ↩

  13. Vancouver School Board, Vancouver School Board and BC Hydro conclude agreement for underground electrical substation at Lord Roberts Annex site. The four priced elements and the stated total, in the district’s own words: “a minimum of $73 million (up to $75 million): $48.3 million for the subsurface parcel (received in September 2018); $16.7 million for various statutory rights-of-way and covenants (received in September 2018); $8.0 million for a five-year construction lease (payable in 2023 when construction of the substation is planned to begin); and, Up to $2.0 million for the construction of a play field at the Lord Roberts Annex site following completion of the substation construction, anticipated in 2028.” ↩

  14. Vancouver School Board, Vancouver School Board approves moving forward with proposal from BC Hydro for underground substation at Lord Roberts Annex property, 27 June 2018. The board approval. The release is datelined Vancouver, 25 June 2018, and records that “At its open board meeting tonight, trustees of the Vancouver School Board approved moving forward with a deal to sell BC Hydro a subsurface parcel beneath the Lord Roberts Annex” site. ↩

  15. Vancouver School Board, Information Bulletin: VSB leases Southern Portion of Sir Sandford Fleming Elementary School Site, 6 December 2024. The executed terms in the district’s own words: a 99-year lease with Vittori Developments Ltd. for the southern portion of the Fleming site, following the Board Policy 20 disposition process, with “A 99-year pre-paid lease for approximately $8.5M, with no provision for overholding”, exclusive use for residential rental housing with optional ground-floor retail, priority access to vacant units for district staff, and the statement that “The Board, the Ministry approved the sub-division and disposal.” ↩