EducationHousing

Primary Sources The documents themselves, cited. Published Wednesdays.

Two instruments, and neither moved a whole site

Vancouver’s school district completed two land instruments in the decade to 2026. One sold the parcel beneath a school and kept the surface. One leased part of a site for 99 years and kept the title.

Selling school land sounds like one kind of transaction. The two the Vancouver board completed in ten years were each narrower than that, and neither moved a whole site.

The two completed instruments.

The board and committee record for the ten years to 2026 contains two completed land instruments and no outright sale of a whole school site1.

FigureWhat it is
2completed instruments in the ten-year record
0whole school sites sold outright
$73m to $75mconsideration on the Lord Roberts Annex agreements
$8.5mconsideration on the Fleming south portion lease

The first is the Lord Roberts Annex. The Board approved a set of agreements on 25 June 20182 and they were concluded by September 2018. Only the subsurface parcel was sold; the surface was retained and a replacement school stands on the site, so the site never left the enrolling inventory1.

The second is the south portion of Sir Sandford Fleming, at 1401 to 1455 East 49th Avenue: a 99-year pre-paid ground lease to Vittori Developments Ltd. and Vittori Lanark Holdings Ltd. for about $8.5 million3, declared surplus on 25 May 2021 and reaching third reading of the by-law on 25 September 2024. The dates in that chain, and what the City’s file adds to them, were set out on 7 September4.

What each instrument moved, and what it left.

ElementLord Roberts AnnexSir Sandford Fleming, south portion
InstrumentSale of the subsurface parcel, with rights-of-way, covenants and a construction leasePre-paid ground lease, 99-year term
Board datesApproved 25 June 2018; agreements concluded by September 2018Surplus 25 May 2021; offer accepted 27 November 2023; third reading 25 September 2024
What transferredThe parcel below the site, statutory rights-of-way and covenants, and use of the surface during constructionPossession of the south portion for the term of the lease
What the board keptThe surface, with a replacement school built on itThe fee simple title, and the reversion at the end of the term
Consideration$48.3m parcel, $16.7m rights-of-way and covenants, $8.0m construction lease, up to $2.0m playfieldAbout $8.5m, pre-paid
On the site nowA replacement school, in enrolling useAbout 87 homes proposed, six storeys, at referral stage
Site area on the recordNot stated in the records read2,396.6 square metres, or 25,797 square feet
Enrolling inventory afterUnchangedUnchanged. The lease covers the south portion of the site

Both instruments left something with the board, and the two somethings are different in kind. At the Annex the board kept an estate in the land, the surface, and put a school back on it. At Fleming the board kept the title and a reversion, and gave up possession for a term longer than any planning horizon it publishes4.

Neither transferred a whole site in fee simple. The ten-year record contains no instrument that did1.

Where the consideration in the ten-year record came from.

Adding the two published considerations gives a decade total of $81.5 million, or $83.5 million taking the upper limit on the Annex playfield element. The Annex agreements account for 89.6 to 89.8 per cent of that, and the Fleming lease for 10.2 to 10.4 per cent5.

So close to nine tenths of the land consideration in this ten-year record came from the transaction in which the district kept the surface, rebuilt the school on it, and continued to enrol students there.

That is an observation about two transactions in one district and no more than that. It supports no expectation about what any other structure would earn on any other site, because a consideration reflects the land, the market and the moment as much as the instrument.

The Annex consideration, in four parts.

The Annex agreements price four separate things: the subsurface parcel at $48.3 million6, statutory rights-of-way and covenants at $16.7 million, a five-year construction lease at $8.0 million, and playfield works at up to $2.0 million1.

The three fixed elements total $73.0 million, and the playfield upper limit carries the range to $75.0 million7. Because one element is stated as a limit rather than an amount, the consideration on this transaction is a range in the records read and not a single figure.

The Fleming consideration, taken once.

The Fleming lease was pre-paid3, so the consideration was settled at the start of a 99-year term. Spread across the term, with no adjustment for discounting, inflation or the timing of the payment, it is about $85,900 a year8.

The City of Vancouver referral report, report date 2 September 2025, states that an estimated total of 87 units would be delivered through the application, at six storeys, with 20 per cent of residential floor area secured below market, on a site of 2,396.6 square metres, and names the landowner as the Board of Education of School District No. 39 (Vancouver)9. The below-market commitment is expressed as a share of residential floor area, so it does not convert to a number of units on the published record.

Two completed instruments, priced side by side
Each column carries the figures published for one instrument. The two sit in the same estate, ten years and one policy apart, and neither transferred a whole site. The record read gives a site area for one and not the other, which limits what the comparison can be taken to mean.

The statutory route each instrument had to take.

Ministerial Order M193/08, effective 3 September 2008, provides that a board “must not dispose of land or improvements by sale and transfer in fee simple or by way of a lease of 10 years or more unless such disposal is to another board or an independent school for educational purposes or is approved by the Minister”10. The same order allows a board to dispose by lease of less than ten years to an agency or organisation for an alternative community use.

On the face of the order, a sale of a parcel and a 99-year lease both fall on the approval side of that line, and the five-year construction lease at the Annex falls under the ten-year threshold on its stated term. The Ministry’s policy page states that “only in exceptional circumstances should a board consider permanently disposing of school property”, and that property sold for non-educational and non-community use must go to public tender or another competitive bidding process11.

The approvals themselves are not in the records read for this piece, and they stand below as an open gate. Until they are read, the routing above describes what the order requires rather than what was done.

One instrument predates the policy, the other sits inside it.

Policy 20, Disposal of Land or Improvements, was adopted on 24 September 2018 and amended on 27 September 202112. The Board approved the Annex agreements on 25 June 20182, three months before the policy was adopted, so that transaction was not made under it1.

The Fleming instrument ran entirely inside the policy period, and its published sequence follows the policy’s order: a surplus declaration on 25 May 2021, then an accepted offer, then a by-law112.

Policy 20 also records Board commitments made in 2015 and 2021 to preserve neighbourhood school sites and to decline disposals that decrease public asset value, with exceptions for partnerships with public entities or First Nations and for approved land swaps and leases12. Both completed instruments retained an interest in the land. The records read do not state whether those commitments were applied to either transaction.

What the comparison establishes, and what it leaves open.

It establishes that two completed instruments exist in the ten-year record, that each retained a different kind of interest for the board, that the published considerations are $73 million to $75 million and about $8.5 million3, and that close to nine tenths of the decade’s land consideration came from the transaction that kept the school on the site.

It does not establish that either instrument was well or badly priced, because a price requires a valuation and no appraisal is in the records read. It does not rank the two structures, because they were made for different sites in different years under different rules. And it does not close the question of what else may have moved, because no consolidated register of school land transactions was located to check a records search against.

Four fields on every completed transaction, published in one place.

Four fields on every completed transaction, published in one place: which estate was transferred, which estate was retained, the parcel area of each, and whether the site remained in enrolling use on the day after closing.

Every figure in this piece already exists in a public document. The four fields would let a reader assemble them without first reading eight years of minutes, and would make the difference between the two structures visible at a glance rather than after a records search.

Such a record would inform and coordinate. It would decide nothing, rank nothing and allocate nothing. Deciding is the Board’s work and the Minister’s. Knowing what has already been done is everyone’s.

The questions this piece leaves open are set out in Sources.13

Sources

  1. Vancouver School Board, board and committee records for the Lord Roberts Annex agreements and the Sir Sandford Fleming south portion, 2018 to 2024, assembled from the published agendas and minutes and retrievable through the district’s agendas and minutes search. The Board approval of 25 June 2018 and the conclusion of the Annex agreements by September 2018, the four priced elements of $48.3 million, $16.7 million, $8.0 million and up to $2.0 million, the retention of the surface and the replacement school on the site, and for Fleming the surplus declaration of 25 May 2021, the offer accepted 27 November 2023, the by-law readings of 23 and 25 September 2024, the 99-year pre-paid ground lease of about $8.5 million, and the named lessees. ↩ ↩2 ↩3 ↩4 ↩5 ↩6

  2. Vancouver School Board, Vancouver School Board approves moving forward with proposal from BC Hydro for underground substation at Lord Roberts Annex property, 27 June 2018. The board approval. The release is datelined Vancouver, 25 June 2018, and records that “At its open board meeting tonight, trustees of the Vancouver School Board approved moving forward with a deal to sell BC Hydro a subsurface parcel beneath the Lord Roberts Annex” site. ↩ ↩2

  3. Vancouver School Board, Information Bulletin: VSB leases Southern Portion of Sir Sandford Fleming Elementary School Site, 6 December 2024. The executed terms in the district’s own words: a 99-year lease with Vittori Developments Ltd. for the southern portion of the Fleming site, following the Board Policy 20 disposition process, with “A 99-year pre-paid lease for approximately $8.5M, with no provision for overholding”, exclusive use for residential rental housing with optional ground-floor retail, priority access to vacant units for district staff, and the statement that “The Board, the Ministry approved the sub-division and disposal.” ↩ ↩2 ↩3

  4. VTCo, The only instrument that runs a century, The Split Record, 7 September 2026. The full Fleming chain with dates, the intervals between each step, the consideration measured against site area and unit count, and the position of a 99-year term against every planning horizon the district publishes. ↩ ↩2

  5. Share of the decade’s land consideration by instrument: 89.6 to 89.8 per cent, and 10.2 to 10.4 per cent. 73.0 + 8.5 = 81.5; 73.0 ÷ 81.5 = 0.896 and 8.5 ÷ 81.5 = 0.104; taking the Annex upper limit, 75.0 ÷ 83.5 = 0.898 and 8.5 ÷ 83.5 = 0.102 It divides two published considerations against their sum, and covers only the two completed instruments in the records read. With no consolidated register, it cannot be treated as the district’s total land revenue for the period. ↩

  6. Vancouver School Board, Vancouver School Board and BC Hydro conclude agreement for underground electrical substation at Lord Roberts Annex site. The four priced elements and the stated total, in the district’s own words: “a minimum of $73 million (up to $75 million): $48.3 million for the subsurface parcel (received in September 2018); $16.7 million for various statutory rights-of-way and covenants (received in September 2018); $8.0 million for a five-year construction lease (payable in 2023 when construction of the substation is planned to begin); and, Up to $2.0 million for the construction of a play field at the Lord Roberts Annex site following completion of the substation construction, anticipated in 2028.” ↩

  7. Total consideration on the Annex agreements: $73.0 million to $75.0 million. 48.3 + 16.7 + 8.0 = 73.0, and 73.0 + up to 2.0 = 73.0 to 75.0 Three of the four elements are fixed amounts and the fourth is stated as an upper limit, so the chain is a range rather than a single figure. The arithmetic adds published amounts and makes no adjustment for the timing of any payment. ↩

  8. The Fleming consideration spread across the term: about $85,900 a year. 8,500,000 ÷ 99 = 85,858.6 A nominal division of a pre-paid amount across the stated term. It applies no discount rate and reflects no view of what the payment was worth on the day it was received. It is a unit of comparison rather than a valuation. ↩

  9. City of Vancouver, referral report on 1401 to 1455 East 49th Avenue, report date 2 September 2025. The estimated total of 87 units, the six-storey form, the 20 per cent of residential floor area secured below market, the site area of 2,396.6 square metres or 25,797 square feet, and the landowner named as the Board of Education of School District No. 39 (Vancouver). ↩

  10. Ministerial Order M193/08, Disposal of Land or Improvements Order, effective 3 September 2008. The prohibition on disposal by sale and transfer in fee simple or by lease of ten years or more without an educational transfer or Minister approval, and the allowance for shorter leases to an agency or organisation for an alternative community use. ↩

  11. Ministry of Education and Child Care, school building closure and disposal policy page. The statement that only in exceptional circumstances should a board consider permanently disposing of school property, and the requirement of public tender or another competitive bidding process for property sold for non-educational and non-community use. ↩

  12. Vancouver School Board, Policy 20, Disposal of Land or Improvements, adopted 24 September 2018, amended 27 September 2021. The adoption and amendment dates, the six-step disposal sequence beginning with a title search and turning on a Board resolution declaring the property surplus, and the recorded Board commitments of 2015 and 2021 on preserving neighbourhood school sites and declining disposals that decrease public asset value. ↩ ↩2 ↩3

  13. Open gate: the executed instruments have not been read. Ministry approvals under Ministerial Order M193/08 for the Lord Roberts Annex agreements and the Sir Sandford Fleming ground lease, and the executed instruments themselves [no public URL located]. Ministry approval of the Fleming ground lease is publicly confirmed. The executed instruments for the Lord Roberts Annex agreements, the parcel areas conveyed, and the approval route taken under the order are not in the public record, which is why the two transactions are not reduced to a common unit here. ↩