The Split Record A personal column by Vik Khanna, published Mondays.
The denominator was bargained
Utilisation is enrolment over capacity. The numerator is a count on a date.
Utilisation is enrolment divided by capacity, and it decides more school arguments than any other single figure. The numerator is a count taken on a date. The denominator comes in two kinds, and by the Ministry’s own wording one of them is set in a collective agreement. The same building has a different utilisation figure in two districts because two bargaining units settled different class sizes.
Utilisation is a ratio: enrolment over capacity, printed as a percentage. Below some threshold it argues for consolidation. Above one hundred it argues for portables and boundary changes. Boards reach for it, ministries reach for it, and so does anyone writing a headline about a school.
The numerator is a count of children on a stated date, and it is about as solid as public figures get. Everything interesting is in the denominator.
What I want to set out here is narrow and it is entirely in the Ministry’s own published wording. The two capacity figures in use are different kinds of number. One is a design constant. The other is the output of a negotiation. They are printed in the same column, in the same font, with no marking to say which is which.
What the Ministry says each figure is.
Nominal capacity is built from notional classes. The Long-Range Facilities Plan Guidelines describe it as a designated design capacity assigned to a new school, based on “a notional number of students for hypothetical classes”, set at 20 for Kindergarten and 25 for grades 1 to 12, and used “only to determine the space allocation for that school”1. The Area Standards carry the same per-space figures at §2.2.12.
Operating capacity is defined against staffing. The same Guidelines give it as “the number of students that it may accommodate, based on the maximum number of students for which teachers may be responsible for in an instructional setting”1. The Area Standards state the operation at §2.2.2: operating capacity “is determined by adjusting the nominal capacity to reflect grade structure and classroom student capacity”2.
The closure report in front of the Vancouver board on 17 December 2025 puts the same distinction in plainer terms. Nominal capacity is “the number of students a school was originally built to hold, based on its physical layout.” Operating capacity is “the number of students the school can currently support, considering how spaces are used and the required staffing levels.”3
The sentence that does the work.
One line in the Ministry Guidelines carries the whole finding. “Class sizes are negotiated as a working condition for teachers in their local contract with a board of education. As such, operating capacities vary between school districts.”1
The Vancouver School Board states its own version of the rule in its long range plan: “the operating capacity of a school is determined by adjusting its nominal capacity to reflect class size, based on class size limits in the local collective agreement.”4
Read those two sentences together and the consequence is exact. Move a building across a district boundary and its nominal capacity travels with it, because nominal capacity is a Ministry rule applied to a floor plan. Its operating capacity changes, because a different bargaining unit settled a different number.
So a utilisation figure quoted without its denominator is carrying a bargaining outcome inside it and showing no sign of having done so. That is the part I think gets lost. The figure looks like a measurement of a building. Part of it is a measurement of a contract.
Three schools, both readings, side by side.
The three elementary schools named to receive students from the Sir Guy Carleton catchment were published with both capacity figures and an enrolment, on one slide, on 28 October 20255. That makes both readings computable for each of them.
| School | Enrolment 2024-25 | Operating capacity | Nominal capacity | Against operating | Against nominal |
|---|---|---|---|---|---|
| Cunningham | 428 | 598 | 660 | 71.6% | 64.8% |
| Weir | 379 | 421 | 465 | 90.0% | 81.5% |
| MacCorkindale | 294 | 444 | 490 | 66.2% | 60.0% |
| All three | 1,101 | 1,463 | 1,615 | 75.3% | 68.2% |
Every percentage in the last two columns is computed here from the published figures6. The gap between the two readings runs from 6.2 to 8.5 percentage points school by school7.
Weir is the one to sit with. Against operating capacity it reads 90.0 per cent, which is a school approaching the ceiling its current staffing supports. Against nominal capacity it reads 81.5 per cent, which is a school with room in it. Both figures come from one slide, published on one day, by one district.
The ratio at these three schools, and where it stops.
Across the three, operating capacity sits at 90.5 to 90.6 per cent of nominal8. The consistency is striking and it is local. It follows from the grade structures of these three particular elementary schools, and the district has published no conversion factor that holds across its estate.
I am going to state the boundary rather than the pattern, because the boundary is the useful part. A ratio observed at three schools with similar grade structures is an artefact of those grade structures. Apply it to a secondary school, or to an elementary school with a different configuration, and it produces a number that looks derived and is invented. The Area Standards make the point in their own worked example, where a nominal 40 Kindergarten and 275 elementary becomes an operating 38 and 256, which is a different proportion in each of the two lines2.
There is no closed-form conversion here: the derivation is a rule applied school by school, and the schedule showing that application stands as an open gate below.
Where the figure lands in a decision.
This is why the definition carries weight rather than being a matter of tidiness. A school at 90.0 per cent and a school at 81.5 per cent are different arguments in a capacity discussion, in a boundary review, and in a report recommending where a closed catchment’s students should go. The same building supports both arguments on the same day.
And the receiving-capacity case in a closure file rests on exactly this arithmetic. The three schools above were presented as able to absorb a catchment. Whether they can depends on which ceiling is being counted against, and the two ceilings are 152 places apart in total9.
Nothing here says any figure is wrong. Nominal and operating are both legitimate measures, the district published both openly, and that openness is the only reason this piece can be written at all. Nothing here argues for or against any closure, any boundary, or any receiving arrangement.
It also reads three schools in one district on one date. The Ministry’s statement that operating capacities vary between districts is general1. Everything else above is local, and the ratio in particular does not travel.
A bargaining outcome, disguised as a property of a building.
The cost is that a bargaining outcome moves through the system disguised as a property of a building. A contract settles, class-size limits move, and every operating capacity in the district shifts underneath a set of utilisation figures that will be quoted next year without anyone recalling why they changed.
The second cost is comparability. Two districts publishing utilisation figures for identical buildings will publish different numbers, correctly, and any table that stacks those numbers against each other is comparing two contracts as much as two estates. Nobody in either district has done anything wrong, and the table is still misleading.
The third cost falls on a parent. A family reading that a school runs at 90 per cent and a family reading that it runs at 81 per cent are picturing different rooms. The record supports both pictures and marks neither.
A label at the point of use.
Every published utilisation figure carries three items beside it: the enrolment date, the capacity definition it used, and, where operating capacity is the denominator, the collective agreement and the term the class-size limits come from10.
That is a change to a template rather than a change to a policy, and it costs a line of text. It would let a reader see, without asking anyone, whether a figure moved because children moved or because a contract settled.
Here is my view. A denominator that was bargained measures an agreement, not a building. Utilisation built on it travels under the name of a fact about a building while describing something else, and that distinction matters because the figure is used to close schools.
Whether any figure changes anyone’s decision is the business of the people who take the decisions, and they take them for documented reasons. The record’s job stops earlier than that. What it can stop doing is handing a reader a percentage that hides which of two ceilings it was measured against.
Sources
-
Ministry of Education, Long-Range Facilities Plan Guidelines, April 2019, published as Appendix O to the Vancouver School Board Long Range Facilities Plan. Nominal capacity as a design figure built from notional class sizes and used only for space allocation, operating capacity as the number a school may accommodate given the maximum a teacher may be responsible for, and the statement that class sizes are negotiated in a local contract and operating capacities therefore vary between school districts. ↩ ↩2 ↩3 ↩4
-
Ministry of Education, Area Standards, May 2012, sections 2.2.1 and 2.2.2. Nominal capacity per instructional space, the rule that operating capacity is determined by adjusting nominal capacity to reflect grade structure and classroom student capacity, and the worked example in which a nominal 40 Kindergarten and 275 elementary becomes an operating 38 and 256. ↩ ↩2 ↩3
-
Vancouver School Board, Proposed Closure of Sir Guy Carleton Elementary School, report of the Superintendent, Special Board Meeting Agenda (Revised), 17 December 2025. The district’s plain-language definitions of nominal and operating capacity at page 4. ↩
-
Vancouver School Board, 2020 Long Range Facilities Plan, District Overview, 2021 Update, May 2022. The district’s own statement that operating capacity is determined by adjusting nominal capacity to reflect class size, based on class size limits in the local collective agreement. ↩
-
Vancouver School Board, Sir Guy Carleton closure consideration, public information session slide deck, 28 October 2025. Operating capacity, nominal capacity and 2024-25 enrolment for Cunningham, Weir and MacCorkindale, all published together on one slide with one date. ↩
-
Utilisation for each school, computed against both published capacity figures.
428 ÷ 598 = 71.6%, 428 ÷ 660 = 64.8%; 379 ÷ 421 = 90.0%, 379 ÷ 465 = 81.5%; 294 ÷ 444 = 66.2%, 294 ÷ 490 = 60.0%; 1,101 ÷ 1,463 = 75.3%, 1,101 ÷ 1,615 = 68.2%Rounded to one decimal place. The enrolment is the 2024-25 figure published on the slide, so all eight percentages share one date. No adjustment is made for programme type, grade configuration or space taken by non-enrolling uses. ↩ -
Distance between the two readings of the same school: 6.2 to 8.5 percentage points.
71.6 − 64.8 = 6.8; 90.0 − 81.5 = 8.5; 66.2 − 60.0 = 6.2The spread between the operating and nominal readings, school by school. It measures the definitional gap and says nothing about whether either figure is a good description of the building. ↩ -
Operating capacity as a share of nominal at these three schools: 90.5 to 90.6 per cent.
598 ÷ 660 = 0.9061; 421 ÷ 465 = 0.9054; 444 ÷ 490 = 0.9061An artefact of the grade structures of these three elementary schools. The district has published no conversion factor that holds across its estate, so this ratio supports no inference about any other school and is printed here with that boundary attached. ↩ -
Distance between the two ceilings across the three schools: 152 places.
1,615 − 1,463 = 152Total nominal capacity less total operating capacity. It sizes the definitional choice in one receiving-capacity case. It does not count usable seats under either definition. ↩ -
Checked, not published. Vancouver School Board, the school-by-school schedule showing how each operating capacity was derived from nominal capacity, and the collective agreement class-size limits applied [no public URL located]. Looked for and absent from public. Individual operating and nominal capacities are published school by school, and the schedule that derives one from the other, naming the class-size limits applied, is not. No district-wide conversion factor is published either, so the ratio observed at any group of schools stays local to those schools. ↩